Pilot purgatory is a contracting problem
Most enterprises can start an AI pilot in weeks and struggle to end one in a year, which stalls their AI transformation at its first step. The cause lies in how pilots are contracted, since nobody at the table is paid on the value the pilot was meant to prove.
of CIOs say their organization has rules for stopping unsuccessful AI pilots
In most pilots the pot was never written down, so every call looks cheap and every extension passes.
- Write the stop rule before the pilot begins
- Put a dollar value on every pilot's KPI
- Tie part of each provider's fee to results
Gartner's 2027 CIO Agenda survey of 2,002 CIOs found that only 31 percent have rules for stopping unsuccessful AI pilots, and only 17 percent have exit criteria for AI in production.1 The same survey found that organizations with stop rules were 2.3 times as likely to be vanguards, at a time when only 13 percent of CIOs report significant or transformational value from AI.1 Read together, the figures suggest that the ability to end a pilot is one of the better predictors of the ability to scale one.
Inside a composite manufacturer, the pattern is familiar. A procurement analytics pilot enters its third extension, the platform license renews each quarter, and the AI consulting team reports progress against a feasibility milestone. The sponsoring vice president shows a new demo at each steering committee, and each extension costs little next to the program budget, so nobody asks for a decision. The pilot survives because every party at the table is paid to continue, and no party is paid on the result.
A pilot is meant to be the first step of an AI transformation, and this one has become a standing cost.
Every party at the pilot table is paid to stay in the game
The incentives behind a stalled pilot are visible in the invoices. The AI consultants bill team-weeks, the integrator bills time and materials, and the model or platform vendor bills consumption or licenses, so each party earns more the longer the pilot runs. Inside the enterprise, closing a program the sponsor has championed reads as a personal failure. Nobody's payment depends on whether the pilot moves the KPI it was chartered to move.
Analysts have measured what follows from those incentives. Gartner predicted that at least 30 percent of generative AI projects would be abandoned after proof of concept by the end of 2025.2 It also expects more than 40 percent of agentic AI projects to be cancelled by the end of 2027, citing escalating costs, unclear business value or inadequate risk controls.3 A widely debated MIT study estimated that about 95 percent of organizations saw no measurable P&L return on $30 billion to $40 billion of generative AI spend, though its small sample and P&L-only method have been contested.4 The common thread is an AI strategy whose value was never defined tightly enough to be tested.
Pot odds explain why weak pilots keep getting funded
A poker player decides whether to call a bet by comparing the price of the call with the size of the pot, weighted by the chance of winning it. A pilot extension is a call, and the pot is the annual value of the KPI the pilot was meant to move. In most pilots the pot was never written down, so every call looks cheap and every extension passes. A stop rule sets the pot odds before the hand is dealt, naming the value at stake, the evidence required and the price at which the organization folds.
Sunk cost makes the problem worse with every round. Each extension adds to the money already spent, which raises the felt cost of stopping even though that money is gone either way. A stop rule moves that judgment to the start, when the pilot was cheap and nobody was attached to it, and frees budget for the few pilots that clear the bar.
The 17 percent figure deserves equal attention from finance leaders. Fewer CIOs have exit criteria for AI in production than have stop rules for pilots,1 so a pilot that drifts into production can run for years without any further test of its value. The discipline that ends a weak pilot belongs at the production gate as well, where an AI-native operating system has to keep proving its value.
Only 31 percent of CIOs have rules for stopping AI pilots, and organizations that have them are 2.3 times as likely to be vanguards.
A stop rule belongs in the pilot contract
A stop rule is credible only when it is written into the commercial terms. The pilot contract should name the KPI, its source system, a baseline measured before work starts, the target with its measurement window, and the attribution method, which are the five fields of an outcome contract. It should also name the decision date and the three permitted verdicts: scale, extend once at a stated price, or stop.
The terms for AI service providers should carry part of the risk. Bain's study of about 200 B2B software vendors found that about 10 percent use outcome meters, and that customer support is the one category where outcome pricing has found a real home.5 A pilot partner willing to accept a reduced fee if the threshold is missed, and a success fee if it is met, has joined the game for the pot. A partner unwilling to price the result has signaled how much confidence it places in the pilot.
Buyers have their own reasons for caution about outcome terms. In a16z's survey of 100 enterprise CIOs, respondents preferred usage pricing and remained uncomfortable with how outcome metrics are set, measured and billed.6 That discomfort is the strongest case for fixing the measurement before the pilot starts, while the sums are still small.
The pilot should also test a reimagined process. A pilot that adds analytics to the old procurement steps can produce a good demo and leave the KPI flat. In a redesigned agentic workflow, agents read purchase requests, match them to contracts and preferred suppliers, draft the order and chase missing approvals, while buyers approve exceptions and off-contract spend. The manual check of each request against the contract disappears. The handoff from requester to buyer becomes a handoff from agent to approver, and the buyer's role moves to approvals and supplier negotiation. The stop rule then tests whether the process redesign moves the KPI, which is the only result worth scaling.
Where stop rules sit on the AI roadmap
A stop rule is the gate between stages on an AI roadmap. Three things must exist before the pilot starts, namely a KPI with a measured baseline, a dollar value for the pot, and one owner who will run the process if the pilot scales. A pilot launched without them has no stage to graduate into.
A pilot that clears its gate opens the adjacent processes. Procurement agents that match requests to contracts can grow into an agentic system for supplier onboarding and invoice matching, which read the same contract and supplier records. Each new pilot can then reuse the same stop rule template and approval limits. Leaders sequence the portfolio against the KPI, funding the next pilot from the budget that stopped pilots release and scaling only those whose process reimagination moved the number. Leaders should ask AI service providers and their AI FDEs to work to the same gate, so the team that builds the pilot also answers for its verdict.
What leaders can do now
- 01Write the stop rule before the pilot begins
Agree the KPI, the baseline, the threshold and the decision date in the statement of work, and record the rule on the AI roadmap as the gate to the next stage. Rules written after the results arrive tend to bend to fit them.
- 02Put a dollar value on every pilot's KPI
Estimate the annual value of hitting the target from volume, unit cost and the measured baseline. That figure is the pot against which every extension should be judged.
- 03Tie part of each provider's fee to results
Pair a modest floor fee with a success fee paid when the threshold is met. AI consulting partners and AI service providers that decline the structure reveal their own confidence.
- 04Give one named executive the authority to fold
That executive should own the KPI after the pilot ends, so the decision to stop and the decision to scale sit with the same person. In our experience, committees rarely end a pilot on schedule.
- 05Set exit criteria for systems already in production
Review each production agent and agentic system against its KPI at a fixed interval, using the same instruments that set the baseline. Retire systems that no longer clear the bar.
Organizations that price the pot, write the stop rule into the contract and give one accountable owner the KPI turn each pilot into a decision with a date. The pilots that survive that test are the ones worth scaling, and the budget released by the others pays for the next steps of the AI transformation. Each scaled pilot then becomes a working part of an AI-native operating model.
How Segeta approaches this
Segeta is an AI implementation partner that treats AI transformation as one accountable engagement, so strategy, build and run sit with one team. A Frame week agrees one KPI and its baseline on your own systems, our agent factory builds the agents for that workflow, and the first one goes live inside your tools within six weeks. Risky actions wait for a named person, and part of our fee follows the KPI.
Questions leaders ask
What is AI pilot purgatory?
AI pilot purgatory describes an organization running many AI proofs of concept that neither scale into production nor stop. In our experience it persists because consultancies, integrators and vendors are paid for effort or consumption, so each party earns more as the pilot continues, while no party is paid on whether the target KPI moves.
What is a stop rule for an AI pilot?
A stop rule is a decision agreed before a pilot starts. It names the KPI, the measured baseline, the threshold the pilot must reach and the date of the verdict. Gartner found that only 31 percent of CIOs have such rules, and organizations that do were 2.3 times as likely to be vanguards.
How should AI pilot contracts be structured?
A pilot contract should carry the five fields of an outcome contract, which are the metric, source, baseline, target and window, and attribution method. It should also set a decision date with defined verdicts. A modest floor fee paired with a success fee aligns the provider with the value the pilot was meant to prove.
Notes and sources
- Gartner, "Gartner Survey Finds Only 13 Percent of CIOs Say Their Enterprise Has Realized Significant or Transformational Value from AI," Gartner press release, October 2026, gartner.com.
- Gartner, "Gartner Predicts 30 Percent of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025," Gartner press release, July 2024, gartner.com.
- Gartner, "Gartner Predicts Over 40 Percent of Agentic AI Projects Will Be Canceled by End of 2027," Gartner press release, June 2025, gartner.com.
- The Register, reporting MIT NANDA, "The GenAI Divide," The Register, August 2025, theregister.com.
- Bain & Company, "AI Pricing: A Reality Check on Effort, Usage, and Outcomes," Bain & Company, August 2026, bain.com.
- Andreessen Horowitz, Wang, Xu, Kahl and Erten, "How 100 Enterprise CIOs Are Building and Buying Gen AI in 2025," a16z, June 2025, a16z.com.