AI RFI and submittal review shortens the wait for answers
A typical construction project generates hundreds of requests for information, and each one waits in a reviewer's queue while crews work around the gap. Leading EPCs and owner's engineers now use AI to answer questions from the documents already on file and to check submittals before they are sent.
requests for information on the average construction project, at about $1,080 each to review and answer
The cheapest RFI is the one answered from existing documents before it is raised, and the RFI log never counts those, so they have to be tracked on purpose.
- Baseline RFI and submittal cycle times from logs
- Index every drawing, specification and approved submittal first
- Count the questions answered before they become RFIs
On a Thursday morning, a field engineer at a composite EPC building a 200-megawatt battery storage project finds that the embed plate spacing on the civil foundation drawing does not match the enclosure vendor's installation guide. She raises a request for information in the project management system and moves the crew to another pad. The engineer of record already has 40 open RFIs on the project and answers them roughly in the order they arrive. The answer is already in the project file, in a vendor submittal approved three months earlier with a revised foundation detail.
Scenes like this repeat hundreds of times on a single job. A Navigant Construction Forum study of 1,362 projects found an average of about 800 RFIs per project, each costing about $1,080 and roughly 8 hours to review and answer.1 This article explains why document control systems could not shorten that queue and what document agents now read across a project's files. It also shows how an EPC or owner's engineer can make review one step in its AI transformation, run against a cycle-time KPI that its AI strategy can be judged on.
The answer usually existed somewhere the asker could not search
A utility-scale project's document set runs to thousands of drawing sheets, specification sections, vendor datasheets, prior RFIs and meeting minutes, each with its own revision history. Document control systems store, route and track these files well, yet they search mostly by file name and metadata. The content of a superseded detail or an approved deviation stays invisible to anyone who does not already know where it sits. FMI's research with PlanGrid found that construction professionals spend about 5.5 hours a week searching for project data.2 An RFI is often the formal version of that search, routed to the one person who knows the file.
Equipment submittals carry the same problem in reverse. An inverter, transformer or enclosure datasheet must be checked line by line against the specification and the utility's interconnection requirements, and a reviewer working through dozens of them can miss a deviation that surfaces only at commissioning. Arcadis found that errors and omissions in contract documents were the leading cause of North American construction disputes in 2024.3 Rules and keyword search could not compare a datasheet value with a specification clause, and hiring more reviewers only lengthened the coordination chain.
Agents read the whole document set before a question becomes an RFI
Agentic systems now index every drawing, specification, submittal and prior RFI on a project together with its revision status. When a field engineer types a question, the agent searches the set and returns an answer with citations to the sheet, clause or approved submittal that supports it. If the documents hold no answer, it drafts a complete RFI with the relevant references, a proposed resolution and the activities affected. Procore, for example, describes an RFI agent that drafts requests from field input and project records and checks submittals against drawings, specifications and historical records.4
On the submittal side, the agent compares each value in a vendor datasheet with the requirement in the specification and produces a compliance matrix with deviations flagged. The reviewer then reads the deviations and the supporting pages, which is where engineering judgment belongs. In these agentic workflows, the engineer of record still answers every design question and approves every submittal, because those decisions carry professional liability that no software holds. Citations matter, given that 57 percent of contractors in a Dodge Construction Network survey cite the reliability or accuracy of AI output as a chief concern.5
Contract and specification reviews ranked as the most effective claims avoidance technique among North American respondents in 2024.3
Days to answer is the KPI, and the reviewer's queue is where it is won
The outcome to measure is the median number of days from a field question to a usable answer, together with the share of submittals approved on first review. Both are cheap to baseline, because every RFI and submittal log already records open and close dates, and the logs from the last two comparable projects give the starting point. The design manager at the EPC, or the document control lead at the owner's engineer, should own the measure.
The non-obvious point is that the RFI log counts only the questions people asked formally. The cheapest RFI is the one answered from existing documents before it is raised, so the program should count deflected questions as a separate number, each one saving roughly the 8 hours of review the Navigant study measured.1 Capturing that saving requires reimagining the process around days to answer, because a faster route through the old first-in, first-out queue leaves the search where it was. The field engineer accepts a cited answer or escalates a drafted RFI, and the reviewer works from a triaged queue with a draft response and references attached. With that process redesign, the hunt through old files disappears as a reviewer task, and the reviewer's role moves to approving answers and judging deviations.
Attribution can rest on a simple per-case log. The system records what the agent answered, whether the field engineer accepted it and whether a later RFI contradicted it, which gives both a value count and an error rate. Comparing median days to answer with the baseline projects, adjusted for RFI volume, then shows whether the queue itself has shortened. The 85 percent of contractors in the Dodge survey who expect AI to reduce time on repetitive tasks will need exactly this evidence.5 The same log becomes part of an AI-native operating system for engineering, one that learns which answers held up.
Where document review sits on the AI roadmap
Document review is a natural early step on an EPC's AI roadmap, because nearly every later agent reads the same drawings and specifications. Three things must come first: a document set indexed with clear revision status, a baseline of days to answer and first-pass approval from recent projects, and a design manager who owns both numbers.
Once the set is searchable and cited, adjacent agents can build on it. A change agent can link each answered RFI to the cost and schedule effects it may carry. A claims agent can assemble the record behind a notice from the same citations, and a commissioning agent can carry flagged submittal deviations into the punch list. Licensed engineers still approve at each of those points, so the process reimagination can spread across new agentic workflows without changing who signs a response.
Leaders should sequence these agents against the KPI, adding the next one once days to answer and first-pass approval have moved on a live project. AI consulting is most useful in setting that sequence and the AI strategy around it, while the process redesign belongs to the design manager and document control. Before hiring AI service providers, check that the AI services on offer put AI consultants and forward-deployed engineers next to document control to index the set, with their reporting tied to days to answer. That order keeps the AI transformation of engineering coordination tied to crews kept working.
What leaders can do now
- 01Baseline RFI and submittal cycle times from logs
Export the logs from two recent comparable projects and compute median days to answer and first-pass approval rates. Those numbers become the targets for the next project.
- 02Index every drawing, specification and approved submittal first
Search is only as good as the document set and its revision status. Assign document control to keep superseded versions clearly marked.
- 03Count the questions answered before they become RFIs
Deflected questions are the largest source of saved review time. Track them separately so the value appears in the KPI.
- 04Pre-check every equipment submittal against the project specification
Send reviewers a compliance matrix with deviations flagged and pages cited. Their time then goes to the deviations that need judgment.
- 05Reimagine the review process and keep design decisions with the engineer of record
In an AI-native operating model, agents find, cite and draft, while licensed engineers answer and approve. Write that boundary into the project execution plan and the firm's AI roadmap.
The volume of questions on a project reflects its complexity, and AI will not make renewable plants simpler to build. It changes how much of a reviewer's day goes to finding answers that already exist. EPCs and owner's engineers that run document work against days to answer, with a named owner, a measured baseline and a redesigned review queue, are likely to keep crews working on the pads where the questions arise. For those firms, the review queue is where AI transformation becomes tangible, and it is the first working piece of an AI-native operating model for engineering coordination.
How Segeta approaches this
Segeta starts with one number on the project, such as days of slip, unbilled milestones or change orders waiting on a signature. A Frame week agrees one KPI and its baseline on your own systems, our agent factory builds the agents for that workflow, and the first one goes live inside your tools within six weeks. Risky actions wait for a named person, and part of our fee follows the KPI.
Questions leaders ask
How is AI used for RFIs in construction?
AI tools index a project's drawings, specifications, submittals and prior RFIs, then answer field questions with citations to the supporting documents. When no answer exists, they draft a complete RFI with references and a proposed resolution for the engineer of record. Licensed engineers still answer design questions and approve the responses.
Can AI review construction submittals?
AI can compare each value in a vendor datasheet with the matching requirement in the specification and produce a compliance matrix with deviations flagged. This shortens the reviewer's work to the items that need judgment. Approval stays with the engineer of record, who carries professional responsibility for the decision.
What KPI measures the value of AI in document control?
The most useful measures are median days from a field question to a usable answer and the share of submittals approved on first review. Both can be baselined from existing RFI and submittal logs. Counting questions answered before they become formal RFIs captures value that the RFI log alone would miss.
Notes and sources
- Bruce Suprenant, "Request for Information (RFI) and Rework," The Voice, American Society of Concrete Contractors, August 2020, citing Navigant Construction Forum, "Impact & Control of RFIs on Construction Projects," ascconline.org.
- PlanGrid and FMI, "New Research from PlanGrid and FMI Identifies Factors Costing the Construction Industry More Than $177 Billion Annually," PR Newswire, August 2018, prnewswire.com.
- Arcadis, "Construction Disputes in Motion: Speed, Agility, and Adapting to Change," 15th Annual Construction Disputes Report, North America, 2025, cmaanet.org.
- Procore, "RFI Agent," product page, accessed November 2026, procore.com.
- Matthew Thibault, "AI nears 'tipping point' in construction as contractors pilot tech: survey," Construction Dive, reporting Dodge Construction Network and CMiC, December 2025, constructiondive.com.